How the work actually gets done.
Phase gates, artifacts, who does what, how we test and roll back, and what you hold at the end. The same method across data, cloud and AI.

Phase gates
Six phases. Nothing moves on without a sign-off.
Each phase has a defined start, a set of artifacts and a gate your owner approves. Small engagements combine phases; none are skipped. Practice detail: data, cloud, AI.
- 01
Mobilize
Week 0–1
Starts with
Signed SOW, NDA and access request
Artifacts
- Kickoff deck: goals, scope, contacts and cadence
- Access plan: read-only first, named accounts with MFA
- RAID log opened
- Communication plan and escalation path
Gate
Access in place; plan for discovery agreed
- 02
Discover and assess
Weeks 1–3
Starts with
Read-only access or exports
Artifacts
- Inventory of systems, versions, dependencies and support dates
- Baselines: performance, cost, reliability or evaluation scores
- Findings and risk register with ratings
- Options with trade-offs
Gate
Written assessment accepted by your technical owner
- 03
Design and plan
With the assessment
Starts with
Accepted findings
Artifacts
- Target architecture and architecture decision records
- Wave or release plan with windows
- Test strategy and acceptance criteria
- Rollback approach for every change
Gate
Design review sign-off; change approved through your process
- 04
Build and rehearse
Per wave or release
Starts with
Approved design
Artifacts
- Infrastructure and configuration as reviewed pull requests
- Automated checks in CI
- End-to-end rehearsal with measured timings
- Runbook and rollback tested in rehearsal
Gate
Go/no-go criteria met; rehearsal report reviewed
- 05
Cut over or release
In your window
Starts with
Go decision
Artifacts
- Runbook executed step by step with named owners
- Data, smoke and performance checks against the baseline
- Change record updated in your tool
Gate
Agreed checks pass; your owner signs off the change
- 06
Hypercare and hand-over
Agreed per SOW
Starts with
Change accepted
Artifacts
- Close monitoring and tuning after go-live
- Runbooks, diagrams, ADRs and dashboards in your repository
- Recorded knowledge-transfer sessions
- Close-out report: what was done, measures against baseline, open items
Gate
Hand-over accepted; access revoked; material returned or deleted
Roles
Who does what
R = responsible, A = accountable, C = consulted, I = informed. Your team stays accountable for scope, approvals and acceptance; we are accountable for the engineering. Adjusted per SOW.
| Activity | SRASH | Your team |
|---|---|---|
| Scope, priorities and acceptance | C | A/R |
| Access provisioning and approvals | C | A/R |
| Discovery, assessment and findings | A/R | C |
| Architecture and design decisions | R | A |
| Build, automation and pull requests | A/R | C |
| Code review and merge approval | R | A |
| Change approval (CAB) and windows | C | A/R |
| Runbook execution and rollback calls | A/R | C |
| Application smoke tests | C | A/R |
| Status reporting and RAID log | A/R | I |
| Documentation and knowledge transfer | A/R | C |
Testing and rollback
Proved in rehearsal, not hoped for in production.
Every production change has go/no-go criteria, a tested rollback and checks against the baseline captured in discovery. Sample cut-over runbook
Data correctness
Row counts, checksums and sampled record comparisons between source and target for every migrated table or collection.
Performance
Critical queries and endpoints compared with the baseline captured in discovery, under representative load.
Resilience
Failover, restore and node-loss tests with measured recovery times, not assumed ones.
Infrastructure
Policy and plan checks on every Terraform or GitOps change before it merges, and drift detection afterwards.
AI quality and safety
Evaluation suite scored on every change, plus permission-leak and prompt-injection tests before release.
Rollback
Every rollback path rehearsed and timed before the production change is approved.
Engineering standards
Everything as code, everything reviewed.
- Infrastructure, configuration and pipelines as code (Terraform or OpenTofu, Helm, GitOps)
- Every change through a pull request with automated checks and your approval
- Environments promoted in order: development, staging, production
- Secrets in your secret manager, never in code, chat or email
- Least-privilege, time-bound access through your identity provider (security practices)
- Significant decisions recorded as architecture decision records
Definition of done
- Acceptance criteria in the SOW met and signed off
- Code and configuration merged through reviewed pull requests in your repository
- Automated checks passing in CI
- Runbook updated and rollback tested
- Monitoring and alerts in place for what changed
- Documentation and ADRs updated
- No open severity-1 or severity-2 defects caused by the change
- Knowledge transfer held with the people who will run it
Communication
You always know where things stand.
A fixed rhythm from week one, in your tools. Replies within one business day; the engineer on the call is the engineer doing the work. Sample status report
| Touchpoint | When | What you get |
|---|---|---|
| Async update | Daily, in your Slack or Teams channel | What moved, what is blocked, what is next |
| Working session | As needed | Pairing and reviews with your engineers |
| Status report and call | Weekly | Status, progress, RAID log, decisions needed |
| Demo | Weekly or per milestone | Working changes shown, not slides |
| Steering review | Monthly, or per phase gate | Sponsor-level progress, risks, scope and outcome measures |
| Close-out | End of engagement | Close-out report, measures against baseline, open items and recommendations |
Hand-over
What you hold at the end
Designed so your team can run, change and audit what we built without us.
Runbooks
Step-by-step operating and recovery procedures, tested during the engagement.
Architecture record
Diagrams and ADRs explaining what was built and why. Sample ADR
Code and pipelines
Terraform, manifests, scripts and CI in your repositories, with history.
Dashboards and alerts
Monitoring for what changed, with alert routes your on-call team owns.
Recorded knowledge transfer
Walk-throughs with your engineers, recorded for people who join later.
Close-out report
What was done, measures against baseline, open items and recommendations.
See the artifacts before you buy
Fictional content, real format. All resources
Sample statement of work outline
The sections, acceptance criteria and change control in a typical fixed-fee statement of work. Fees are stated in each real SOW, not here.Sample deliverableSample weekly status report
The one-page report you receive every week: status, progress, risks, decisions needed and next steps.Sample deliverableSample architecture decision record (ADR)
How we record a significant technical decision: context, options considered, the decision and its consequences.Sample deliverableSample RAID log: risks, assumptions, issues and dependencies
The register we keep from day one and review with you weekly, with owners, ratings and mitigations.Sample deliverableSample cut-over runbook: PostgreSQL major upgrade with blue/green
A step-by-step runbook excerpt with timings, owners, checks and the rollback path.Sample deliverableSample assessment report: database upgrade readiness
The structure and depth of the written plan you receive at the end of a paid assessment, shown with fictional systems.Do you work in our tools or bring your own?
Yours. We work in your ticketing (Jira, Azure DevOps, ServiceNow), your repositories (GitHub, GitLab, Bitbucket), your chat and your change process. Nothing lives only on our side.
Who reviews your code?
Your engineers approve merges. Every change goes through a pull request with automated checks; nothing is changed by hand in production outside an approved runbook step.
What does hypercare cover?
A period after go-live, length set in each SOW, when we watch what changed, tune it and fix issues caused by our work within the agreed fee.
How do you handle a failed change?
We roll back using the rehearsed path when go/no-go or post-change checks fail, record what happened in the RAID log and agree the next attempt with you. A rollback is a planned outcome, not an emergency.
Can our team learn as we go?
Yes. We pair with your engineers, record knowledge-transfer sessions and hand over runbooks written for the people who will run the system.
Do you follow ITIL or SAFe?
We fit the process you have. We file change records for your change advisory board, work in your sprints and report in the format your PMO uses.